Ares Strategic Mining Begins Stockpiling Ore at Utah Fluorspar Mine, Advancing U.S. Critical Mineral Production
February 18th, 2026 2:42 PM
By: Newsworthy Staff
Ares Strategic Mining has commenced active mining operations at its Lost Sheep Fluorspar Mine in Utah, stockpiling thousands of tons of ore to prepare for processing and reinforcing domestic supply of this mineral essential for steel, aluminum, semiconductors, and clean energy technologies.

Ares Strategic Mining Inc. has announced that mining operations at its Lost Sheep Fluorspar Mine in Utah are now actively underway, with several thousands of tons of fluorspar ore successfully mined and stockpiled at surface in preparation for processing. This milestone marks a decisive transition from development to production build-up and represents tangible progress toward sustained acidspar output. Underground operations are advancing steadily, with ore being extracted, transported to surface, and organized into structured stockpiles to support upcoming processing runs.
The current stockpiling phase allows Ares to build strategic ore inventory ahead of flotation plant commissioning, optimize blending and grade control for consistent processing performance, ensure uninterrupted feedstock supply once processing begins, and demonstrate visible and measurable production momentum. The stockpiling initiative is part of Ares’ broader strategy to ensure smooth ramp-up into full acidspar production. With underground development advancing and surface infrastructure in place, the Company is methodically positioning itself for consistent throughput once the flotation plant becomes operational.
James Walker, President and CEO of Ares Strategic Mining, commented that seeing hundreds of tons of ore at surface is a powerful validation of the hard work the team has put into bringing the Lost Sheep back into production. This represents real progress that is tangible, measurable, and visible, with the company building momentum step by step. Over the coming weeks, Ares expects to continue expanding surface stockpiles, advance flotation plant readiness, prepare for initial processing runs, and move closer to steady-state production.
Fluorspar is a designated U.S. critical mineral essential for steel and aluminum manufacturing, fluorochemicals and refrigerants, semiconductor and electronics production, clean energy technologies, and defense and national security applications. As the only permitted and operating fluorspar mine in the United States, Ares continues to reinforce its position as a cornerstone of domestic supply. The commencement of stockpiling demonstrates not just operational readiness, but the Company’s commitment to disciplined execution and long-term value creation. The Lost Sheep Fluorspar Project is located in the Spor Mountain area, Juab County, Utah, approximately 214 km south-west of Salt Lake City, and is fully permitted including mining permits approved by the Bureau of Land Management.
The Company has settled $185,199.23 CAD for services rendered by consultants and service providers by issuing 381,854 common shares, which are subject to a statutory hold period of four months and one day from the date of issuance. Ares remains focused on delivering sustainable growth, operational excellence, and shareholder value as it advances toward full production capacity. The original release can be viewed on New Media Wire.
Source Statement
This news article relied primarily on a press release disributed by NewMediaWire. You can read the source press release here,
